The specialization of the cylinder market has brought us many surprises. The classification of cylinders is very wide, mainly based on their application in different mechanical equipment. Rotary cylinders are one of them, and their application is quite special. Only after professional technical installation can they be put into normal operation. Let's learn the correct installation and usage method of the cylinder below.
It is important to choose the appropriate cylinder according to one's own needs. It is important to clarify what type of cylinder one needs. When ordering from manufacturers, spot checks can be conducted on some products based on the order quantity. It is recommended to choose manufacturers with reliable reputation, large brands, and good quality. Do not buy low-quality products at a low price, as using them in industrial production will delay the entire production line.
Before using the cylinder, it must undergo appropriate treatment. Firstly, we need to check whether the cylinder is damaged and whether there is any looseness in the bolt connection, which greatly reduces the trouble of installation.
During the installation process, the piston rod of the cylinder must not be overloaded to withstand external forces, nor must it deviate in direction. It must be aligned with the axis direction of the piston.
There are various forms of installation, but regardless of the installation method, it is necessary to ensure that the angle cylinder does not deform. A deformed cylinder cannot be used. The connection cannot be made by welding, which cannot guarantee the long-term use of the cylinder body.
During the horizontal installation of the angle cylinder, attention should be paid to the horizontal angle and the angle that is more conducive to inspection and maintenance should be selected. The front, middle, and rear parts of the piston rod should maintain a balanced state.
Before using the cylinder, the most important step is adjustment. The primary task is to adjust the speed and speed control valve, which should not fluctuate too much and should be fine tuned. At the beginning, the control valve is not easy to open too wide, and there needs to be a buffering process to allow the inertia energy of the piston to be fully absorbed.
After the cylinder is installed, it will be put into normal operation. The work of a cylinder is mainly a process of converting pressure into power. Within the operating pressure range, it is necessary to try 2-3 times without pressure to ensure that the cylinder can work normally before applying pressure.
Buffer tape is a commonly used auxiliary tool in corner cylinders, and it should be used before operation. Adjust the adjustment belt to the minimum resistance position. After the cylinder is put into normal operation, increase the buffering resistance until it is adjusted to the most suitable position.
After all the programs are completed, lubricating oil should be added to the bolts and connections to buffer resistance, reduce friction, and extend mechanical life.